How to Check this Installation Procedure
Symbols in the Illustration
The frequently-performed operations are described with symbols in this procedure.
Screw
1x
Unused Parts
Packaged Item
Install
Harness
Connector
(Common for Guides and Clamps)
1x
1x
1x
Connect
Remove
Install
Power
Check the sound
Check visually
ON
OFF
Check Items when Turning OFF the Main Power
Check that the main power switch is OFF
1) Turn OFF the main power switch of the host machine.
2) Be sure that display in the Control Panel and the lamp of the main power supply are turned
off, then disconnect the power plug.
6
Installation > Product Name
1x
1x
1x
Tighten
Loosen
Remove
Power Cord
1x
Connect
Disconnect
Disconnect
Check
Push
Cleaning
6
Installation > Product Name
Points to Note When Relocating the Host machine
CAUTION:
If this machine with the Reinforcing Plate Cover is moved, followings may occur.
• Possibility of damaging customer's floor (carpeting, etc.)
• Possibility of overturning
Refer to the following Staple Finisher-S1 Service Manual Chapter 4 "Parts Replacement
and Cleaning Procedure" > "Removing the Equipment" > "Removing the Finisher Unit
from the Connected Equipment", "Removing the Reinforcing Plate Cover from the
Connected Equipment" for the procedure of removal.
F-6-1
Product Name
Safety regulations require the product's name to be registered. In some regions where this
product is sold, the following name may be registered instead.
• F711400
6-2
F-6-2
6-2