ABB RELION REC650 Manuals
Manuals and User Guides for ABB RELION REC650. We have
4
ABB RELION REC650 manuals available for free PDF download: Technical Manual, Commissioning Manual
ABB RELION REC650 Technical Manual (592 pages)
Brand:
ABB
| Category:
Industrial Equipment
| Size: 12.31 MB
Table of Contents
Table of Contents
7
Introduction
33
This Manual
33
Intended Audience
33
Product Documentation
34
Product Documentation Set
34
Document Revision History
35
Related Documents
35
Symbols and Conventions
36
Safety Indication Symbols
36
Manual Conventions
36
Available Functions
39
Control and Monitoring Functions
39
Back-Up Protection Functions
43
Designed to Communicate
44
Basic IED Functions
44
Analog Inputs
47
Introduction
47
Operation Principle
47
Settings
48
Local Human-Machine-Interface LHMI
51
Local HMI Screen Behaviour
51
Identification
51
Settings
51
Local HMI Signals
51
Function Block
52
Signals
52
Basic Part for LED Indication Module
52
Identification
52
Function Block
53
Signals
53
Settings
54
LCD Part for HMI Function Keys Control Module
54
Identification
54
Function Block
54
Signals
55
Advertisement
ABB RELION REC650 Commissioning Manual (130 pages)
650 SERIES Bay control Version 2.2
Brand:
ABB
| Category:
Control Unit
| Size: 3.48 MB
Table of Contents
Table of Contents
7
Section 1 Introduction
13
This Manual
13
Intended Audience
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
16
Document Symbols and Conventions
16
Symbols
16
Document Conventions
17
IEC 61850 Edition 1 / Edition 2 Mapping
18
Section 2 Safety Information
23
Symbols on the Product
23
Warnings
23
Safety Information
24
Caution Signs
25
Note Signs
25
Section 3 Available Functions
27
Back-Up Protection Functions
27
Control and Monitoring Functions
27
Communication
31
Basic IED Functions
33
Section 4 Starting up
35
Factory and Site Acceptance Testing
35
Commissioning Checklist
35
Checking the Power Supply
36
Energizing the IED
36
Checking the IED Operation
36
IED Start-Up Sequence
37
Setting up Communication between PCM600 and the IED
37
Writing an Application Configuration to the IED
42
Checking CT Circuits
43
Checking VT Circuits
44
Using the RTXP Test Switch
44
Checking the Binary Input/Output Circuits
45
Binary Input Circuits
45
Binary Output Circuits
45
Checking Optical Connections
46
Section 5 Configuring the IED and Changing Settings
47
Overview
47
Configuring Analog CT Inputs
48
Supervision of Input/Output Modules
48
Section 6 Establishing Connection and Verifying the SPA/IEC Communication
51
Entering Settings
51
Entering SPA Settings
51
Entering IEC Settings
51
Verifying the Communication
52
Verifying IEC Communication
52
Verifying SPA Communication
52
Fibre Optic Loop
53
Optical Budget Calculation for Serial Communication with SPA/IEC
53
Section 7 Establishing Connection and Verifying the LON Communication
55
Communication Via the Rear Ports
55
LON Communication
55
The LON Protocol
56
Hardware and Software Modules
56
Optical Budget Calculation for Serial Communication with LON
58
Section 8 Testing IED Operation
59
Preparing for Test
59
Requirements
59
Preparing the IED to Verify Settings
61
Activating the Test Mode
62
Preparing the Connection to the Test Equipment
62
Connecting the Test Equipment to the IED
63
Releasing the Function to be Tested
64
Verifying Analog Primary and Secondary Measurement
65
Testing the Protection Functionality
66
Forcing of Binary Input/Output Signals for Testing
66
Enable Forcing by Using LHMI
66
Forcing Concept
66
How to Enable Forcing
66
Enable Forcing Using TESTMODE Function Block
67
Forcing by Using LHMI
67
How to Change Binary Input/Output Signals Using Forcing
67
Forcing by Using PCM600
69
How to Undo Forcing Changes and Return the IED to Normal Operation
71
Undo Forcing by Using LHMI
71
Undo Forcing by Using PCM600
71
Undo Forcing by Using TESTMODE Component
71
Section 9 Testing Functionality by Secondary Injection
73
Testing Disturbance Report
73
Introduction
73
Disturbance Report Settings
73
Disturbance Recorder (DR)
73
Event Recorder (ER) and Event List (EL)
74
Identifying the Function to Test in the Technical Reference Manual
75
Multipurpose Protection
75
General Current and Voltage Protection CVGAPC
75
Built-In Overcurrent Feature (Non-Directional)
75
Overcurrent Feature with Current Restraint
76
Overcurrent Feature with Voltage Restraint
76
Overcurrent Feature with Directionality
77
Completing the Test
78
Over/Undervoltage Feature
78
Secondary System Supervision
78
Current Circuit Supervision CCSSPVC
78
Verifying the Settings
78
Completing the Test
79
Fuse Failure Supervision FUFSPVC
79
Checking that the Binary Inputs and Outputs Operate as Expected
79
Measuring the Operate Value for the Negative Sequence Function
80
Measuring the Operate Value for the Zero-Sequence Function
81
Checking the Operation of the Du/Dt and DI/Dt Based Function
82
Measuring the Operate Value for the Dead Line Detection Function
82
Completing the Test
83
Control
83
Synchrocheck, Energizing Check, and Synchronizing SESRSYN
83
Testing the Synchronizing Function
84
Testing the Synchrocheck Functionality
85
Testing the Energizing Check
87
Completing the Test
89
Testing the Voltage Selection
89
Apparatus Control APC
89
Single Command, 16 Signals SINGLECMD
90
Interlocking
90
Logic
90
Tripping Logic, Common 3-Phase Output SMPPTRC
90
Phase Operating Mode
90
1Ph/3Ph Operating Mode
91
1Ph/2Ph/3Ph Operating Mode
92
Circuit Breaker Lockout
93
Completing the Test
93
Monitoring
94
Gas Medium Supervision SSIMG
94
Testing the Gas Medium Supervision for Pressure Alarm and Pressure Lockout Conditions
94
Completing the Test
95
Testing the Gas Medium Supervision for Temperature Alarm and Temperature Lock out Conditions
95
Liquid Medium Supervision SSIML
95
Testing the Liquid Medium Supervision for Level Alarm and Level Lockout Conditions
95
Completing the Test
96
Testing the Liquid Medium Supervision for Temperature Alarm and Temperature Lock out Conditions
96
Breaker Monitoring SSCBR
96
Verifying the Settings
97
Completing the Test
98
Event Function EVENT
99
Fault Locator LMBRFLO
99
Completing the Test
100
Measuring the Operate Limit
100
Limit Counter L4UFCNT
100
Completing the Test
101
Metering
101
Pulse-Counter Logic PCFCNT
101
Function for Energy Calculation and Demand Handling ETPMMTR
101
Verifying the Settings
101
Completing the Test
103
Station Communication
103
Multiple Command and Transmit MULTICMDRCV / MULTICMDSND
103
Basic IED Functions
103
Parameter Setting Group Handling SETGRPS
103
Verifying the Settings
103
Completing the Test
104
Exit Test Mode
104
Section 10 Commissioning and Maintenance of the Fault Clearing System
105
Commissioning Tests
105
Periodic Maintenance Tests
105
Visual Inspection
106
Maintenance Tests
106
Preparation
106
Alarm Test
107
Recording
107
Secondary Injection
107
Self Supervision Check
107
Trip Circuit Check
107
Measurement of Service Currents
108
Restoring
109
Section 11 Troubleshooting
111
Checking the Self Supervision Signals
111
Checking the Self Supervision Function
111
Determine the Cause of an Internal Failure
111
Self Supervision HMI Data
111
General IED Status
111
Fault Tracing
112
Internal Fault Indications
112
Using Front-Connected PC
113
Diagnosing the IED Status Via the LHMI Hint Menu
114
Troubleshooting
115
Repair Instruction
116
Repair Support
117
Maintenance
117
Section 12 Glossary
119
ABB RELION REC650 Commissioning Manual (108 pages)
Bay control
Brand:
ABB
| Category:
Control Unit
| Size: 2.9 MB
Table of Contents
Table of Contents
7
Introduction
13
This Manual
13
Intended Audience
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
15
Symbols and Conventions
16
Safety Indication Symbols
16
Manual Conventions
16
Safety Information
19
Symbols on the Product
19
Warnings
19
Caution Signs
20
Note Signs
21
Available Functions
23
Back-Up Protection Functions
23
Control and Monitoring Functions
24
Designed to Communicate
27
Basic IED Functions
27
Starting up
29
Factory and Site Acceptance Testing
29
Commissioning Checklist
29
Checking the Power Supply
30
Energizing the IED
30
Checking the IED Operation
30
IED Start-Up Sequence
30
Setting up Communication between PCM600 and the IED
31
Writing an Application Configuration to the IED
35
Checking CT Circuits
36
Checking VT Circuits
36
Checking the RTXP Test Switch
37
Checking Binary Input and Output Circuits
37
Binary Input Circuits
38
Binary Output Circuits
38
Checking Optical Connections
38
Establishing Connection and Verifying the IEC 61850 Station Communication
39
Setting the Station Communication
39
Verifying the Communication
39
Testing IED Operation
41
Preparing the IED to Verify Settings
41
Activating Test Mode
42
Preparing the Connection to the Test Equipment
43
Connecting Test Equipment to the IED
43
Releasing the Function to be Tested
44
Verifying Analog Primary and Secondary Measurement
45
Testing Protection Functionality
46
Testing Functionality
47
Testing Disturbance Report
47
Introduction
47
Disturbance Report Settings
47
Identifying the Function to Test in the Technical Reference Manual
47
Testing Current Protection Functions
47
Instantaneous Phase Overcurrent Protection PHPIOC (50)
47
Measuring the Operate Limit of Set Values
48
Completing the Test
48
Four Step Phase Overcurrent Protection OC4PTOC (51_67)
48
Verifying the Settings
48
Completing the Test
49
Instantaneous Residual Overcurrent Protection EFPIOC (50N)
49
Measuring the Operate Limit of Set Values
50
Completing the Test
50
Four Step Residual Overcurrent Protection EF4PTOC (51N/67N)
50
Four Step Directional Residual Overcurrent Protection
50
Four Step Non-Directional Residual Overcurrent Protection
51
Completing the Test
51
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE (67N)
51
Measuring the Operate and Time Limit for Set Values
51
Completing the Test
55
Thermal Overload Protection, One Time Constant LPTTR (26)
55
Breaker Failure Protection CCRBRF (50BF)
56
Checking the Phase Current Operate Value, Pickup_Ph
56
Checking the Residual (Ground Fault) Current Operate Value Pickup_N Set below
56
Pickup_Ph
56
Checking the Re-Trip and Back-Up Times
57
Verifying the Re-Trip Mode
57
Verifying the Back-Up Trip Mode
58
Verifying the Case Retripmode = Contact
58
Verifying the Function Mode Current&Contact
59
Completing the Test
59
Stub Protection STBPTOC (50STB)
60
Measuring the Operate Limit of Set Values
60
Completing the Test
60
Pole Discrepancy Protection CCRPLD (52PD)
60
Verifying the Settings
61
Completing the Test
61
Broken Conductor Check BRCPTOC (46)
61
Measuring the Operate and Time Limit of Set Values
61
Completing the Test
62
Directional Underpower Protection GUPPDUP (37)
62
Verifying the Settings
62
Completing the Test
64
Directional Overpower Protection GOPPDOP (32)
64
Verifying the Settings
64
Completing the Test
65
Testing Voltage Protection Functions
65
Two Step Undervoltage Protection UV2PTUV (27)
65
Verifying the Setting
65
Completing the Test
66
Two Step Overvoltage Protection OV2PTOV (59)
66
Verifying the Settings
66
Two Step Residual Overvoltage Protection ROV2PTOV (59N)
66
Completing the Test
67
Loss of Voltage Check LOVPTUV (27)
67
Measuring the Operate Limit of Set Values
67
Completing the Test
68
Testing Frequency Protection Functions
68
Underfrequency Protection SAPTUF (81)
68
Verifying the Settings
68
Completing the Test
69
Overfrequency Protection SAPTOF (81)
69
Verifying the Settings
69
Completing the Test
70
Rate-Of-Change Frequency Protection SAPFRC (81)
70
Verifying the Settings
70
Completing the Test
71
Testing Secondary System Supervision Functions
71
Current Circuit Supervision CCSRDIF (87)
71
Verifying the Settings
71
Fuse Failure Supervision SDDRFUF
71
Checking that the Binary Inputs and Outputs Operate as Expected
72
Measuring the Operate Value for the Negative Sequence Function
72
Measuring the Operate Value for the Zero-Sequence Function
73
Checking the Operation of the DV/Dt and DI/Dt Based Function
73
Completing the Test
74
Testing Control Functions
74
Synchrocheck, Energizing Check, and Synchronizing SESRSYN (25)
74
Testing the Synchronizing Function
76
Testing the Synchrocheck Check
76
Testing the Energizing Check
78
Testing the Voltage Selection
79
Completing the Test
80
Autorecloser SMBRREC (79)
80
Preparation of the Verification
82
Switching the Autorecloser Function to Enabled and Disabled
82
Verifying the Autorecloser Function SMBRREC (79)
82
Checking the Reclosing Conditions
83
Completing the Test
84
Interlocking
84
Apparatus Control APC
84
Testing Logic Functions
85
Tripping Logic SMPPTRC (94)
85
Three Phase Operating Mode
85
Circuit Breaker Lockout
85
Completing the Test
85
Testing Monitoring Functions
86
Event Counter CNTGGIO
86
Testing Metering Functions
86
Pulse Counter PCGGIO
86
Exit Test Mode
86
Commissioning and Maintenance of the Fault Clearing System
87
Installation and Commissioning
87
Commissioning Tests
88
Periodic Maintenance Tests
88
Visual Inspection
89
Maintenance Tests
89
Troubleshooting
93
Fault Tracing
93
Identifying Hardware Errors
93
Identifying Runtime Errors
93
Identifying Communication Errors
93
Checking the Communication Link Operation
93
Checking the Time Synchronization
94
Running the Display Test
94
Indication Messages
94
Internal Faults
94
Warnings
95
Additional Indications
96
Correction Procedures
96
Changing and Setting the Password
96
Identifying IED Application Problems
96
Inspecting the Wiring
96
Glossary
101
Advertisement
ABB RELION REC650 Commissioning Manual (110 pages)
Brand:
ABB
| Category:
Controller
| Size: 2.3 MB
Table of Contents
Table of Contents
9
Section 1 Introduction
15
This Manual
15
Intended Audience
15
Product Documentation
16
Product Documentation Set
16
Document Revision History
17
Related Documents
17
Symbols and Conventions
18
Safety Indication Symbols
18
Manual Conventions
19
Functions Included in 650 Series Ieds
19
Section 2 Starting up
25
Factory and Site Acceptance Testing
25
Commissioning Checklist
25
Checking the Power Supply
26
Energizing the IED
26
Check the IED Operation
26
IED Start-Up Sequence
26
Setting up Communication between PCM600 and the IED
27
Writing an Application Configuration to the IED
31
Checking CT Circuits
32
Checking VT Circuits
32
Checking the RTXP Test Switch
33
Checking Transducer Circuits
33
Checking Binary Input and Output Circuits
34
Binary Input Circuits
34
Binary Output Circuits
34
Checking Optical Connections
34
Section 3 Establishing Connection and Verifying the IEC 61850 Station Communication
35
Setting the Station Communication
35
Verifying the Communication
35
Section 4 Testing IED Operation
37
Preparing the IED to Verify Settings
37
Activating Test Mode
38
Preparing the Connection to the Test Equipment
39
Connecting Test Equipment to the IED
40
Releasing the Function to be Tested
40
Verifying Analog Primary and Secondary Measurement
41
Testing Protection Functionality
42
Section 5 Testing Functionality
43
Testing Disturbance Report
43
Introduction
43
Disturbance Report Settings
43
Disturbance Recorder (DR)
43
Event Recorder (ER) and Event List (EL)
44
Identifying the Function to Test in the Technical Reference Manual
45
Testing Current Protection Functions
45
Instantaneous Phase Overcurrent Protection PHPIOC
45
Measuring the Operate Limit of Set Values
45
Completing the Test
46
Four Step Phase Overcurrent Protection OC4PTOC
46
Verifying the Settings
46
Completing the Test
47
Instantaneous Residual Overcurrent Protection EFPIOC
47
Completing the Test
48
Four Step Directional Residual Overcurrent Protection
48
Four Step Residual Overcurrent Protection EF4PTOC
48
Measuring the Operate Limit of Set Values
48
Completing the Test
49
Four Step Non-Directional Residual Overcurrent Protection
49
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE
49
Measuring the Operate and Time Limit for Set Values
50
Breaker Failure Protection CCRBRF
55
Completing the Test
55
Thermal Overload Protection, One Time Constant LPTTR
55
Checking the Phase Current Operate Value, IP
56
Checking the Re-Trip and Back-Up Times
56
Checking the Residual (EF) Current Operate Value IN> Set below IP
56
Verifying the Back-Up Trip Mode
57
Verifying the Re-Trip Mode
57
Verifying the Case Retripmode = no CB Pos Check
59
Verifying the Function Mode Current&Contact
59
Completing the Test
60
Measuring the Operate Limit of Set Values
60
Stub Protection STBPTOC
60
Completing the Test
61
Pole Discordance Protection CCRPLD
61
Verifying the Settings
61
Completing the Test
62
Broken Conductor Check BRCPTOC
62
Measuring the Operate and Time Limit of Set Values
62
Completing the Test
63
Directional Under-Power Protection GUPPDUP
63
Verifying the Settings
63
Completing the Test
65
Directional Over-Power Protection GOPPDOP
65
Completing the Test
66
Verifying the Settings
66
Testing Voltage Protection Functions
67
Two Step Undervoltage Protection UV2PTUV
67
Completing the Test
67
Verifying the Setting
67
Two Step Overvoltage Protection OV2PTOV
68
Completing the Test
68
Verifying the Settings
68
Two Step Residual Overvoltage Protection ROV2PTOV
68
Completing the Test
69
Loss of Voltage Check LOVPTUV
69
Measuring the Operate Limit of Set Values
69
Completing the Test
70
Testing Frequency Protection Functions
70
Under Frequency Protection SAPTUF
70
Verifying the Settings
70
Completing the Test
71
Over Frequency Protection SAPTOF
71
Verifying the Settings
71
Completing the Test
72
Testing Secondary System Supervision Functions
73
Current Circuit Supervision CCSRDIF
73
Completing the Test
73
Verifying the Settings
73
Fuse Failure Supervision SDDRFUF
73
Checking that the Binary Inputs and Outputs Operate as Expected
74
Measuring the Operate Value for the Negative Sequence Function
74
Measuring the Operate Value for the Zero Sequence Function
75
Checking the Operation of the Du/Dt and DI/Dt Based Function
76
Completing the Test
76
Testing Control Functions
77
Synchronizing and Energizing Check SESRSYN
77
Testing the Synchronizing Function
78
Testing the Synchrocheck
79
Testing the Energizing Check
81
Autorecloser SMBRREC
83
Completing the Test
83
Testing the Voltage Selection
83
Preparation of the Verification
85
Switching the Auto-Reclosing Function on and off
86
Verifying the Auto-Reclosing Function
86
Checking the Reclosing Conditions
87
Apparatus Control APC
88
Completing the Test
88
Interlocking
89
Testing Logic Functions
89
Three Phase Operating Mode
89
Tripping Logic SMPPTRC
89
Circuit Breaker Lockout
90
Completing the Test
90
Testing Monitoring Functions
91
Event Counter CNTGGIO
91
Testing Metering Functions
91
Pulse Counter PCGGIO
91
Exit Test Mode
91
Section 6 Troubleshooting
93
Fault Tracing
93
Identifying Hardware Errors
93
Identifying Runtime Errors
93
Identifying Communication Errors
93
Checking the Communication Link Operation
94
Checking the Time Synchronization
94
Running the Display Test
94
Indication Messages
95
Internal Faults
95
Additional Indications
96
Warnings
96
Correction Procedures
96
Resetting the Configuration
96
Changing and Setting the Password
97
Identifying IED Application Problems
97
Inspecting the Wiring
97
Section 7 Glossary
101
Advertisement
Related Products
ABB Relion 630 Series
ABB RELION Series
ABB Relion SAM600
ABB Relion REM615
ABB RELION 650
ABB REC650 ANSI
ABB RER 103
ABB RER103-BM
ABB RER103-MB
ABB RET650 A07A OLTC
ABB Categories
Industrial Equipment
Controller