ASSEMBLY Congratulations! You have just purchased the Check to see that all bolts, washers and Husqvarna Towable Aerator - a precision-engi- nuts are included in the plastic bag. Check neered product designed to provide maximum for any signs of damage that may have oc- aeration performance and flexibility.
Page 4
ASSEMBLY Align jack lift assembly hole “B” with clear- ance holes in frame and attach jack assem- bly to bracket on axle using 3/8” x 1 1/2” bolt and 3/8” washers and lock nut. See TIE BAR Figure 4. FIGURE 6 Attach the tie bars to the aerator bed and to the tow bar as seen in Figure 6.
Page 5
ASSEMBLY CAUTION! The wheels should be fully extended or fully retracted. NEVER operate with wheels partially retracted, dam- age to the jack could result. Add a small amount of oil to the lift jack. See Figure 8. Oil should be added after every 25 hours of operation and after wash- ing unit.
OPERATION When replacing worn or damaged tines, use included washers and torque to 15 ft./lbs. Weights may be added into pan to increase depth of ground pen- etration up to the limits shown in the specification section. Se- cure weights into the pan if used on rough ground or on angled surface.