Summary of Contents for Dell PowerSwitch S4048-ON

  • Page 1 Dell PowerSwitch S4048-ON Installation Guide February 2024 February 2024 Rev. A09...
  • Page 2 A WARNING indicates a potential for property damage, personal injury, or death. © 2014 - 2024 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its subsidiaries. Other trademarks may be trademarks of their respective owners.
  • Page 3: Table Of Contents

    Contents Chapter 1: About this guide......................5 Related documents................................5 Chapter 2: The S4048–ON switch....................6 Introduction...................................6 Features....................................7 Physical dimensions................................7 Switch status..................................8 LED display.................................... 8 LED behavior...................................9 Prerequisites..................................10 S4048–ON configurations..............................11 Chapter 3: Site preparations......................12 Site selection..................................12 Cabinet placement................................12 Rack mounting..................................
  • Page 4 European Union Directive Conformance Statement....................38 Japan VCCI Compliance for Class A Equipment......................38 Korean Certification of Compliance..........................39 Safety Standards and Compliance Agency Certifications..................39 Electromagnetic Compatibility ............................40 Product recycling and disposal............................40 Chapter 10: Technical Support....................42 Dell support..................................42 Contents...
  • Page 5: Chapter 1: About This Guide

    • Related documents Related documents For more information about the S4048–ON switch, see the following documents: ● Dell Networking S4048–Open Networking (ON) Getting Started Guide ● Dell Networking S4048–Open Networking (ON) Release Notes ● Dell Open Networking Troubleshooting Guide NOTE: For the most recent documentation, see https://www.dell.com/support.
  • Page 6: Chapter 2: The S4048-On Switch

    The S4048–ON switch The following sections describe the Dell S4048–ON switch: Topics: • Introduction • Features • Physical dimensions • Switch status • LED display • Prerequisites • S4048–ON configurations Introduction S4048-ON is a networking switch for campus aggregation and core switching 10 Gbps servers and 40 Gbps optical uplinks to the 40 Gbps switching fabric in the core.
  • Page 7: Features

    Figure 3. S4048–ON PSU-side view 1. Power supply unit 1 2. Fan module 3. Out-of-band management port 4. Power supply unit 2 5. RS-232 serial console port Features The S4048–ON offers the following features: ● Forty-eight fixed 1/10 Gbps SFP+ ports ●...
  • Page 8: Switch Status

    Switch status You can view S4048–ON status information using the light emitting diodes (LEDs). LED display The S4048–ON includes LED displays on both the I/O Port and PSU side of the chassis, as shown. Some LED behaviors may change after you install your software. Figure 4.
  • Page 9: Led Behavior

    LED behavior The following S4048–ON switch LED behavior is seen during open networking installation environment (ONIE) operations: Figure 5. S4048–ON LEDs 1. Master LED 2. System LED 3. Power LED 4. Fan LED 5. Locator LED 6. SFP+ link or activity LEDs 7.
  • Page 10: Prerequisites

    Table 1. S4048–ON LED behavior (continued) Description ● Flashing amber—Power supply warning event; power continues to operate. LOCATOR LED ● Off—Locator function is disabled. ● Flashing blue—Locator function is enabled. Table 2. Management Ethernet port LEDs  Description Link LED ● Off—No Link ●...
  • Page 11: S4048-On Configurations

    ● Copper/fiber cables Other optional components are: ● Ground cable ● Additional power supply unit ● Additional fan module ● Additional mounting brackets if installing in a four-post rack or cabinet S4048–ON configurations You can order the S4048–ON switch in several different configurations. You can also order optional modules and optics separately.
  • Page 12: Chapter 3: Site Preparations

    Storing components Site selection Install Dell equipment in restricted access areas. A restricted access area is one in which service personnel can only gain access using a special tool, lock, key or other means of security and access is controlled by the authority responsible for the location.
  • Page 13: Rack Mounting

    Storing components If you do not install your S4048–ON and components immediately, Dell Technologies recommends properly storing the switch and all optional components by following these guidelines. ● Storage location temperature must remain constant ranging from -40° to 158°F (from -40°C to 70°C).
  • Page 14 NOTE: ESD damage can occur when components are mishandled. Always wear an ESD-preventive wrist or heel ground strap when handling the S4048–ON and its accessories. After you remove the original packaging, place the S4048–ON and its components on an anti-static surface. Site preparations...
  • Page 15: Chapter 4: Nebs Compliance

    NEBS compliance For your switch to be network equipment building system (NEBS) compliant, you must follow the instructions that are detailed in this chapter. To be NEBS-compliant, orient your switch in the rack so that the air inlet is from the front aisle, and the air exhaust is to the back aisle.
  • Page 16: Chapter 5: S4048-On Installation

    S4048–ON installation To install the S4048–ON switch, Dell Technologies recommends completing the installation procedures in the order that is in this chapter. Always handle the S4048–ON and its components with care. Avoid dropping the switch or its field replaceable units (FRUs).
  • Page 17: Readyrails System Installation

    NOTE: The figures in this document are not intended to represent a specific switch. NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace. Rack mount safety considerations ● Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, causing damage to the equipment and possible personal injury.
  • Page 18: Two-Post Flush-Mount Configuration

    Two-post flush-mount configuration CAUTION: Your switch is not NEBS Earthquake Z4-compliant if you use this installation method. 1. For this configuration, remove the latch castings from the front side of each ReadyRails assembly, item 1. To remove the two screws from each front flange ear on the switch side of the rail and remove each casting, use a Torx screwdriver.
  • Page 19: Four-Post Threaded Configuration

    Figure 8. Two-post center-mount configuration 2. Slide the back bracket towards the post and secure it to the post flange with two user-supplied screws, item 2.  3. Repeat this step for the second rail. Four-post threaded configuration CAUTION: To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings that are described in Step 1.
  • Page 20: S4048-On Installation

    2. For each rail, attach the front and rear flanges to the post flanges with two user-supplied screws at each end, item 2. S4048-ON installation You can mount the switch in the 1U front-rack or 1U flush and center two-post configurations. The following is an example of a front-rack configuration: For the 1U flush and center two-post configurations, slide the switch into the rails in the same manner as the four-post configurations.
  • Page 21: Ground Cable

    Dell Technologies recommends grounding your switch. To attach the ground cable to the chassis, use a single M4x0.7 screw. The cable itself is not included with the S4048–ON. To properly ground the chassis, Dell Technologies recommends using a 6 AWG one-hole lug, #10 hole size, 63" spacing, not included in shipping. The one-hole lug must be a UL recognized, crimp-type lug.
  • Page 22: Sfp+ And Qsfp+ Optic Installation

    Switch power-up Supply power to the S4048–ON after it is mounted in a rack or cabinet. Dell Technologies recommends reinspecting your switch before powering up. Verify the following: ● The equipment is properly secured to the rack and properly grounded, optional.
  • Page 23: After S4048-On Installation

    After S4048–ON installation After you have securely installed and powered on the S4048-ON, to configure your switch, see your open network installation environment (ONIE)-compatible operating system documentation at https://opencomputeproject.github.io/onie/. S4048–ON installation...
  • Page 24: Chapter 6: Power Supplies

    The PSUs are field replaceable. When running with full redundancy—two power supplies installed and running, you can remove and replace one PSU without disrupting traffic. NOTE: If you use a single PSU, install a blank plate in the other PSU slot. Dell Technologies recommends using power supply 2 (PSU2) as the blank plate slot. NOTE: ESD damage can occur if components are mishandled.
  • Page 25: Ac Power Supply Installation

    NOTE: If you use a single PSU, install a blank plate in the other PSU slot. If you are only using one power supply, Dell Technologies recommends installing the power supply in the first slot (PSU1) and installing a blank plate in the second slot (PSU2).
  • Page 26: Ac Power Supply Replacement

    NOTE: If you use a single PSU, install a blank plate in the other PSU slot. If you are only using one power supply, Dell Technologies recommends installing the power supply in the first slot (PSU1) and installing a blank plate in the second slot (PSU2).
  • Page 27: Dc Power Connections

    2. Remove the PSU from the electro-static bag. 3. Insert the PSU into the switch PSU slot. Insert the PSU exposed PCB edge connector first. The PSU slot is keyed so that the PSU inserts fully in one orientation only. Figure 15.
  • Page 28: Dc Labels

    Figure 16. DC power connector and wiring block 1. Wiring block 2. Power connector 3. PSU connector 1. Strip a 1/2-inch section of insulation from each of the power connector wires, as shown. 2. Insert each of the power connector’s bare wire lengths into the wiring block. The blue wire is -48V, the black wire is the positive return, and the yellow/green wire is the ground wire, as shown.
  • Page 29 Figure 17. DC power label Figure 18. DC input rating label Figure 19. Switch regulatory label Power supplies...
  • Page 30: Chapter 7: Fans

    Fans The S4048–ON comes from the factory with one PSU and three fan modules installed in the chassis. The fan modules and the power supplies, which have integrated fans, are hot-swappable. NOTE: To run the switch, the three fan slots must have operating fan units. If you do not install a module in each slot, the switch shuts down in one minute.
  • Page 31: Fan Module Installation

    Fan module installation The fan modules in the S4048–ON are field replaceable. Module slot 1 is on the left side of the chassis, module slot 2 is in the middle of the chassis, and module slot 3 is on the right side of the chassis.
  • Page 32: Chapter 8: Management Ports

    Management ports Besides the 10 GbE and 40 GbE switch ports, the S4048–ON switch provides several ports for management and storage. Topics: • RS-232 console port access • Micro USB-B console port access • Before you install an OS RS-232 console port access The RS-232 console port is on the PSU-side of the S4048-ON chassis, as shown.
  • Page 33: Micro Usb-B Console Port Access

    Micro USB-B console port access The MicroUSB-B console port is on the I/O side of the switch. NOTE: The S4048-ON switch uses the Silicon Labs CP2109 USB-B chip. To find the correct USB-B universal asynchronous receiver-transmitter (UART) driver, see https://www.silabs.com/products/development-tools/software/ usb-to-uart-bridge-vcp-drivers.
  • Page 34: Before You Install An Os

    ONIE: Diag ONIE Run Diagnostic package for S4048-ON Dell EMC DIAG Run Dell EMC Networking Diagnostic package for <platform> During initial setup, the switch boots to ONIE Install. ONIE Install boots with ONIE Discovery to the console (ONIE:). Management ports...
  • Page 35: Onie Service Discovery

    ONIE service discovery ONIE attempts to locate the installer through several discovery methods, as shown. To download and run an installer, the ONIE Service Discovery feature uses the first successful method found. 1. Passed from the boot loader. 2. Search locally attached storage devices for one of the ONIE default installer filenames (for example, USB). 3.
  • Page 36: Chapter 9: Specifications

    Specifications This chapter lists the S4048–ON specifications. CAUTION: Operate the product at an ambient temperature not higher than 45°C (113°F). CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced. Replace only with the same or equivalent type of battery. Dispose of the batteries according to the manufacturer instructions.
  • Page 37: Ieee Standards

    Table 7. Environmental parameters (continued) Parameter Specifications Shock Meets Bellcore Zone 4 earthquake requirements (MIL- STD-810) Table 8. AC power requirements  Parameter Specifications Power supply 100–240 VAC 50/60 Hz Maximum current draw per system 5.8 A @ 398.02 watts/100vac 2.9 A @ 398.02 watts/200vac Maximum power consumption 460 Watts Typical power consumption...
  • Page 38: European Union Directive Conformance Statement

    Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Dell is not responsible for any radio or television interference caused by using other than recommended cables and connectors or by unauthorized changes or modifications in the equipment.
  • Page 39: Korean Certification Of Compliance

    NOTE: Use the AC power cords with Dell equipment only. Do not use Dell AC power cords with any unauthorized hardware. Figure 24. Japan: Warning Label Korean Certification of Compliance Figure 25. Korean Certification of Compliance Figure 26. Korean Package Label...
  • Page 40: Electromagnetic Compatibility

    You must recycle or discard this switch according to applicable local and national regulations. Dell encourages owners of information technology (IT) equipment to responsibly recycle their equipment when it is no longer needed. Dell offers a variety of product return programs and services in several countries to assist equipment owners in recycling their IT products.
  • Page 41 EEE on the environment and human health due to the potential presence of hazardous substances in EEE. Dell products, which fall within the scope of the WEEE, are labeled with the crossed-out wheelie-bin symbol, as shown above, as required by WEEE.
  • Page 42: Chapter 10: Technical Support

    Dell support Dell support The Dell support site provides documents and tools to help you use Dell equipment and mitigate network outages. Through the support site you can obtain technical information, access software upgrades and patches, download available management software, and manage your open cases. The Dell support site provides integrated, secure access to these services.