Page 2
To our valued customer, Thank you for choosing a Thank you for choosing a product by product by Manufacturing Solutions. We are pleased that we are able to provide equipment to Manufacturing Solutions. We are pleased that we are able to provide equipment to make your work easier.
POINT. KEEP HANDS AWAY FROM THE JOINT WHERE THE CAUSING PROPERTY DAMAGE OR SERIOUS INJURY. UPPER AND LOWER MASTS MEET. IN A DRY ENVIRONMENT AVOID MOISTURE AND WATER Ques�ons? - Call paragon Pro Manufacturing Solu�ons Customer Service at 1-800-448-0822 or 701-775-0551...
ASME Standards for wire rope (cable) inspection and replacement Reprinted with permission from ASME B30.19 Cableways The following is intended as a helpful guide to the general topic of inspection and replacement of wire rope (cable). It is not intended to be an exhaustive treatment of the topic. Frequent inspection (at least daily) by a competent person and prompt replacement of any cable that shows any sign of ®...
CARE AND MAINTENANCE Inspect cable FREQUENTLY. (At least daily and before each use) Replace at the first sign of wear. Occasionally oil the cable sheaves and caster bearings. Store the HANGPRO™ Drywall Lift in a dry place. Apply household paraffin to the surfaces of the telescoping sections, for smoother action.
ASSEMBLY 1. Place the Lower Mast Assembly face down on the floor as shown. 2. Attach the Wheel Leg Assembly to the Lower Mast Assembly with the warning decal facing the top of the mast section. Insert the tapered tabs into the slots as shown.
Page 9
ASSEMBLY CONTINUED 8. Place the winch on the mounting plate at the back of the HANGPRO™, with the gear side of the winch near the mast. 9. Insert three 7/8” x 3/8” bolts down through the winch base and mounting plate and attach the 3/8”...
Page 10
ASSEMBLY CONTINUED 14a. The carriage bolt head must be positioned through a square hole on the inside of the winch spool with the washer and nut on the outside of the spool wall. Tighten with 3/8” wrench. 15. Attach the Cable Keeper to the top of the Upper Mast. 16.
OPERATION PREPARING DRYWALL PANELS Drywall panels are typically stocked leaning horizontally in small stacks against walls. When the drywall bundle is opened the first panel has to be flipped around so the good side of the panel is facing out. LOADING A PANEL Center the lift on the panel and position about an inch away from the panel.
Page 12
OPERATION CONTINUED USING THE FRONT WHEELS FOR PRECISE POSITIONING When the lift is leaned forward onto the front wheels it can be moved side-to-side for the precise positioning before or after lifting the panel. REMOVING THE LIFT AFTER PANEL IS SECURED Secure the panel to the wall.
SAFETY INFORMATION This product contains trace amounts of the following items which are known to cause. These chemicals are not hazerdous under product’s intended use. Please review CAS# for more informa�on. Chemical Hazard CAS# % By Weight Arsenic Trace 7440-38-2 Cancer Cadmium Trace...
If a TELPRO INC product is proven to be defective in material or workmanship within the covered time frame from the date of purchase, return the defective part to PARAGON PRO MANUFACTURING SOLUTIONS INC and we will either repair or replace the part at our option. We will neither assume nor authorize any other person to assume for us any other liability.
Page 16
uestions about assembly? Can’t find a part? Need some other help? Call us: 1.800.448.0822 701.775.0551 We’ll get you set up! W W W e W W e W ’ll get W W W W W W W e W W e W W W ’ll get ’ll get ’ll get...