iX-3 Series
Quick Installation Guide
Mailing System Components :
system base
feeding table
and moistener
Unpack all components from the box, remove packaging and any
transit tape.
Lift the mailing system base
(a)
slightly on the left hand side and align the hooks to
attach the feeding table (b). Attach the catch tray
(c)
to the right hand side of the
mailing system base.
Installation Process
1 LAN
OK
Mem
Select LAN and press 'OK' to test connection type.
An online interactive installation guide is available at :
mailing
catch tray
back of mailing system base
Lift the cover of the mailing system base
reveal the meter
(h)
and ink cartridge
Lower weighing platform release panel (tailgate) at rear
of the mailing system base (a). Place weighing platform
(d)
on top of the mailing system base and slide forward to
lock. Lift release panel and secure clip cable into place.
Installation Process
Press the 'Next' to start the
Online service
declaration.
Next
Mem
Complete the declaration by following the steps on screen.
weighing platform (WP)
Open the meter cover. Place the meter
(h)
(a)
to
(i)
bays.
until it fits securely into position. Close the meter cover.
Insert the WP connector
system base (a). Then connect the LAN cable
to each side of the mailing system.
Headset alignment
A C E G I K
Select letter with arrows
and press «OK»
B D F H J
It is recommended to follow screen prompts to
test ink alignment.
kb.quadient.us/ix3_install
LAN cable
power cable
weighing platform
(WP) connector
into the meter bay and slide in
Insert the ink cartridge
upwards. Push the ink cartridge
base until you hear a 'click'. Close the cover.
(e)
into the port on the rear of the mailing
(f)
and power cable
(g)
Amount
Postage Available
$ 100.00
Enter amount:
$ 10
Mem
Once back on the home screen, press the coins
button and then select '2' to add funds. Enter the
amount and then press the white check button.
ink cartridge
meter
(i)
into the ink bay with the 'TOP' sticker facing
(i)
towards the back of the mailing system
Turn on the mailing system base
(a)
using the
switch behind the power cable
(g)
and follow the
steps on screen.
Your mailing system base is now ready to use. Please turn
this sheet over for your Quick Start Guide.