Page 1
SUN2000-(25KTL, 30KTL)-US User Manual Issue Draft C Date 2016-01-12 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
The figures provided in this document are for reference only. The actual product appearance prevails. This document is subject to update and revision. You can log in to http://support.huawei.com/carrier, search for SUN2000 or browse SUN2000 documents, and download the latest version. Intended Audience This document is intended for photovoltaic (PV) power station personnel and qualified electrical technicians.
Do not remove the anti-dismantle label on the SUN2000 enclosure. Otherwise, product warranty will be forfeited. Installation Read this document before installation. Huawei shall not be liable for any consequence caused by violation of the regulations specified in this document. ...
Page 96
SUN2000 to OFF, wait 5 minutes, SUN2000. and flip the DC SWITCH to ON. Check whether the fault is rectified. If the fault persists, contact Huawei technical support. 1. Manually clear the alarm and AFCI Major...